NORTON SIMON MUSEUM
• Renovated this dual-purpose theater for live performances and film viewing in 6 months
• Completed this project without interfering with museum operations
• Installed sustainable Hemlock wood around the entire perimeter of the building
• Used recycled carpeting, acoustical panels and insulation materials
• Upgraded the acoustical ceilings and walls
• Updated the stage lighting systems and installed a new lighting management system
• Made major improvements to the projection booth and installed projection ports for enhanced sound isolation and clarity
|